Challenges associated with this project included working in and around a working hospital and functioning kitchen,  and coordinating duct and piping above a ceiling with 
limited space.  Apollo utilized 3D scanning and imaging on this project.  This gave the owner extra confidence that Apollo was going above and beyond to make sure these systems fit within the existing structure.

Apollo‚Äôs scope included 
hydronic piping, steam piping, ductwork and HVAC equipment including two air handlers and multiple exhaust fans.  

 Slideshow Image
 Slideshow Image
 Slideshow Image
Relevant Project Details:
  • Owner: Confluence Health
  • General Contractor: VK Powell
  • Project Duration: January, 2018 - July, 2018
  • Contract Value: 1,666,608.00