This project affects all the operating rooms inside Rose Medical. Shut down work must be done around the clock until completed utilizing different crews.

Apollo‚Äôs scope included demo of existing air handler in the mechanical room, installation of a new air handler with associated piping and equipment, and included new chilled water, heating water, steam and condensate piping.  Also included new exhaust, return and supply duct work. 

 Slideshow Image
 Slideshow Image
 Slideshow Image
Relevant Project Details:
  • Owner: Rose Medical Facilities
  • General Contractor: JE Dunn
  • Project Duration: January, 2018 - July, 2018
  • Contract Value: $1,812,059.
  • Square Ft: 370,000